Professor record CONE

Ali Nejat

Texas Tech University

Grade distribution unavailable
Evaluations: 2021–2025
Flunk Score—
Not enough comparison data

A reliable within-course grade or school-relative evaluation comparison is needed to score CONE 5320.

CONE 5320 · Construction Cost Estimating and ControlCONE 5320 · all instructors & syllabi

Student evaluations

4.79 / 5 School avg. 4.35

14 median item responses

How the ratings compare

Compared with the school, highest difference first.

Instructor tailored instructions/ lessons to variety of perspectives+0.55
Opportunities to be successful in course+0.51
Course was organized+0.47
Course assignments facilitated learning+0.43
Instructor helped to understand relevance of course content+0.43
Instructors teaching methods helped to learn course content+0.39
Overall course helped learn required concepts/ skills+0.38
Instructor presented material in way that helped engage in course+0.32
Left: below school averageRight: above school average

0 = school average for each question. +0.50 means half a point above it on the 1–5 rating scale.

View exact values

TTU HB2504 (8-item) · in CONE 5320 · A signal, not a grade

Means on a 1–5 scale. Response totals above describe the combined record, not each question.
QuestionRecordSchoolDifference
Course was organized4.794.31+0.47
Course assignments facilitated learning4.784.34+0.43
Opportunities to be successful in course4.774.26+0.51
Overall course helped learn required concepts/ skills4.784.40+0.38
Instructor helped to understand relevance of course content4.894.46+0.43
Instructors teaching methods helped to learn course content4.744.35+0.39
Instructor presented material in way that helped engage in course4.784.46+0.32
Instructor tailored instructions/ lessons to variety of perspectives4.784.23+0.55
Find a course or professor

Search helper · Uses this school’s records. Try “compare ECON 101” or a professor’s name.